Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13705712

- Product Categories
- Friendly Links
Information Name: | You know the protective door installation considerations do |
Published: | 2015-05-11 |
Validity: | 30 |
Specifications: | |
Quantity: | 1.00 |
Price Description: | |
Detailed Product Description: | 1: hinge-side frame body is retention, retention or pull explosion retention tab, you need a solid 2: For hinge-side vertical frame positioning point must be done on the same plane surface 3: to be cement After drying the slurry or foam rubber, sheet and plate to remove the gap 4: Check the required installation ray protective doors, checking for radiation protection door switch is flexible and smooth 5: Adjust the vertical position of the lock bits wide body , making the door to achieve a uniform position with a gap between the door frame and make a final fixed after applying protective coatings ray showed the film intact, shiny, no swelling, shrinking, cracking, blistering, flaking and chalking features. Mainly used for the requirements of anti-radiation, easy to remove radioactive contamination of the wall; the wall painting places isotope laboratory, hospital CT room, X-ray room, computer room and other radiation hazards. http://www.cnhyjt.com/ |
Admin>>>
You are the 5430 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin factory lead weights All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 5430 visitor
Copyright © GuangDong ICP No. 10089450, Tianjin factory lead weights All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility